Sunday, July 30, 2006

The Ongoing Bathroom Project

This picture is entitled "Chiseling away the Eighties":
Posted by Picasa
"Father-in-Law Peering into the Underworld":
Posted by Picasa
"The Tub is Ready to Jump!":
Posted by Picasa
"A Glimpse up through the Drain at the Pulsating Ever Growing Verdant Vista of the Ultraworld":
Posted by Picasa
"Rusted Tub and Trees: a Mixed Media Installation":
Posted by Picasa

3 comments:

Scott said...

This looks like a nice, leisurely project. Did it take you 2 hours or 3?
I trust you stood the tub in the front yard, with a statue of the Virgin Mary in it.

Sleepwalker said...

Great 'work-in-progress' pics.

What the heck is that on the tub surround walls? It looks like it's trying to be some really great stonework, but obviously must not be. If they were able to put it right over the top of tiles.

Jon said...

SWEET! Glad to see I'm not hte only one getting attacked by a bathroom project. I have 1/2 the subfloor out of mine, gutted to the studs. I have my tub on order, plumber is lined up! good thing we have two bathrooms. Looks like fun so far!