This picture is entitled "Chiseling away the Eighties":
"Father-in-Law Peering into the Underworld":
"The Tub is Ready to Jump!":
"A Glimpse up through the Drain at the Pulsating Ever Growing Verdant Vista of the Ultraworld":
"Rusted Tub and Trees: a Mixed Media Installation":
Sunday, July 30, 2006
Subscribe to:
Post Comments (Atom)
3 comments:
This looks like a nice, leisurely project. Did it take you 2 hours or 3?
I trust you stood the tub in the front yard, with a statue of the Virgin Mary in it.
Great 'work-in-progress' pics.
What the heck is that on the tub surround walls? It looks like it's trying to be some really great stonework, but obviously must not be. If they were able to put it right over the top of tiles.
SWEET! Glad to see I'm not hte only one getting attacked by a bathroom project. I have 1/2 the subfloor out of mine, gutted to the studs. I have my tub on order, plumber is lined up! good thing we have two bathrooms. Looks like fun so far!
Post a Comment